Database migration code first from Package Manager Console (PMC)

by Admin 25. March 2006 07:59

In visual studio

Make sure you choose the right project in the dropdown list in PMC 

From PMC - Package Manager Console

add-migration AddScheduledDurationToConference

update-database

Tags:

The launch of the uk replica watches new timepiece series undoubtedly symbolizes the replica watches history of the brand, and the classic hublot replica watches design explains the mission of the replica watches uk brand's precision watchmaking.

TextBox

Tag cloud

    RecentPosts